2026 (ACP) Pavement Resurfacing

Share 2026 (ACP) Pavement Resurfacing on Facebook Share 2026 (ACP) Pavement Resurfacing on X (formerly Twitter) Share 2026 (ACP) Pavement Resurfacing on Linkedin Email 2026 (ACP) Pavement Resurfacing link

Project Description:

Pavement Resurfacing ACP (Asphalt Concrete Pavement “Hot Mix”) for Township Road 524 (Range Road 15 to Range Road 21), Range Road 21 (Township Road 524 to Township Road 523) & Willow Peak Estates Subdivision Road.

(Actual limits of construction are to be determined, limits may change without notice, follow page for updates.)


Scope of Work:

Resurfacing of the existing Pavement Surface.


Schedule:

Est. Start date: As early as July 2026

Schedule can change without notice, follow page for monthly updates.


Project Co-ordinator:

Contractor (Primary Contact): TBD

Consultant: (Secondary Contact): WSP, Clayton Kolkman, 587-489-0134, clayton.kolkman@wsp.com

Parkland Project Officer: Dan Spray, 780-968-8353, dan.spray@parklandcounty.com


Updates:

June 2026: RFQ posted. Construction anticipated to start in July/August.

May 2026: Engineering design being finalized with RFQ anticipated to be posted in June.

March 2026: Engineering consultant has been engaged to complete the asphalt surfacing engineering design; construction is anticipated to start as early as July 2026.


Location:



Project Description:

Pavement Resurfacing ACP (Asphalt Concrete Pavement “Hot Mix”) for Township Road 524 (Range Road 15 to Range Road 21), Range Road 21 (Township Road 524 to Township Road 523) & Willow Peak Estates Subdivision Road.

(Actual limits of construction are to be determined, limits may change without notice, follow page for updates.)


Scope of Work:

Resurfacing of the existing Pavement Surface.


Schedule:

Est. Start date: As early as July 2026

Schedule can change without notice, follow page for monthly updates.


Project Co-ordinator:

Contractor (Primary Contact): TBD

Consultant: (Secondary Contact): WSP, Clayton Kolkman, 587-489-0134, clayton.kolkman@wsp.com

Parkland Project Officer: Dan Spray, 780-968-8353, dan.spray@parklandcounty.com


Updates:

June 2026: RFQ posted. Construction anticipated to start in July/August.

May 2026: Engineering design being finalized with RFQ anticipated to be posted in June.

March 2026: Engineering consultant has been engaged to complete the asphalt surfacing engineering design; construction is anticipated to start as early as July 2026.


Location:



Page last updated: 26 Jun 2026, 12:57 PM