Bridge Repairs - RR 73 South of Twp 514 (File 13218)

Share Bridge Repairs - RR 73 South of Twp 514 (File 13218) on Facebook Share Bridge Repairs - RR 73 South of Twp 514 (File 13218) on X (formerly Twitter) Share Bridge Repairs - RR 73 South of Twp 514 (File 13218) on Linkedin Email Bridge Repairs - RR 73 South of Twp 514 (File 13218) link

Project Description:

Replacement of Bridge File 13218 on RR 73 South of Twp 514


Scope of Work:

Removal of the existing bridge culvert and installation of a new bridge culvert. The road will be closed, and traffic will be detoured to an alternate route for the duration of construction.

Upgrading of Range Road 73 is not included in the project scope.


Schedule:

Construction is complete.

Schedule can change without notice, follow page for monthly updates.


Project Co-ordinator:

Contractor (Primary Contact): TBD

Consultant: (Secondary Contact): TBD

Parkland Project Engineer: Balbina Nagera, E.I.T., 780-691-4598, balbina.nagera@parklandcounty.com


Updates:

November 2026: Construction has been completed and the project is currently in the warranty period. As there are no active construction activities at this time, no further updates will be provided.

October 2026: The RFQ has been awarded to Boss Bridgeworks. Range Road 73 will be closed, with a detour via Range Road 71. Detour also posted in the left navigation under Traffic Detour.

August 2026: The RFQ has been posted. Contract award is anticipated in September 2026. The estimated construction start date will be determined following award.


Location:


Project Description:

Replacement of Bridge File 13218 on RR 73 South of Twp 514


Scope of Work:

Removal of the existing bridge culvert and installation of a new bridge culvert. The road will be closed, and traffic will be detoured to an alternate route for the duration of construction.

Upgrading of Range Road 73 is not included in the project scope.


Schedule:

Construction is complete.

Schedule can change without notice, follow page for monthly updates.


Project Co-ordinator:

Contractor (Primary Contact): TBD

Consultant: (Secondary Contact): TBD

Parkland Project Engineer: Balbina Nagera, E.I.T., 780-691-4598, balbina.nagera@parklandcounty.com


Updates:

November 2026: Construction has been completed and the project is currently in the warranty period. As there are no active construction activities at this time, no further updates will be provided.

October 2026: The RFQ has been awarded to Boss Bridgeworks. Range Road 73 will be closed, with a detour via Range Road 71. Detour also posted in the left navigation under Traffic Detour.

August 2026: The RFQ has been posted. Contract award is anticipated in September 2026. The estimated construction start date will be determined following award.