Bridge Replacement – RR271, South of Twp 534 File 00110

Share Bridge Replacement – RR271, South of Twp 534 File 00110 on Facebook Share Bridge Replacement – RR271, South of Twp 534 File 00110 on Twitter Share Bridge Replacement – RR271, South of Twp 534 File 00110 on Linkedin Email Bridge Replacement – RR271, South of Twp 534 File 00110 link

Project Description:

Replacement of Bridge File 00110 on Range Road 271 south of Twp Road 534


Scope of Work:

Replacement of the existing bridge with a new bridge structure.

Not included in scope of work - upgrading of Range Road 271.


Schedule:

Est. TBD 2025. Approximately 4 - 6 weeks of active construction.

Schedule can change without notice, follow page for monthly updates.

Project Co-ordinator:

Contractor (Primary Contact): TBD

Consultant: (Secondary Contact): TBD

Parkland Project Officer: Franco Giammarioli, E.I.T. (780) 968-8888 ext. 8390 franco.giammarioli@parklandcounty.com


Updates:

May 5, 2025 – No update, land acquisition is ongoing.

March 2025 - Land Acquisition is ongoing. Construction anticipated to be in the fall (September/October 2025).

February 2025 – Preliminary Engineering is complete. Detailed Design and Land Acquisition are on going. Construction anticipated to be int the fall (September/October 2025).

January 2025 – No Update.

December 2024 – Engineering design is ongoing. Construction anticipated to be in the fall. (September/October 2025).


Location:

Project Description:

Replacement of Bridge File 00110 on Range Road 271 south of Twp Road 534


Scope of Work:

Replacement of the existing bridge with a new bridge structure.

Not included in scope of work - upgrading of Range Road 271.


Schedule:

Est. TBD 2025. Approximately 4 - 6 weeks of active construction.

Schedule can change without notice, follow page for monthly updates.

Project Co-ordinator:

Contractor (Primary Contact): TBD

Consultant: (Secondary Contact): TBD

Parkland Project Officer: Franco Giammarioli, E.I.T. (780) 968-8888 ext. 8390 franco.giammarioli@parklandcounty.com


Updates:

May 5, 2025 – No update, land acquisition is ongoing.

March 2025 - Land Acquisition is ongoing. Construction anticipated to be in the fall (September/October 2025).

February 2025 – Preliminary Engineering is complete. Detailed Design and Land Acquisition are on going. Construction anticipated to be int the fall (September/October 2025).

January 2025 – No Update.

December 2024 – Engineering design is ongoing. Construction anticipated to be in the fall. (September/October 2025).


Location:

Page last updated: 06 May 2025, 11:09 AM