Bridge Replacement – RR271, South of Twp 534 File 00110

Share Bridge Replacement – RR271, South of Twp 534 File 00110 on Facebook Share Bridge Replacement – RR271, South of Twp 534 File 00110 on Twitter Share Bridge Replacement – RR271, South of Twp 534 File 00110 on Linkedin Email Bridge Replacement – RR271, South of Twp 534 File 00110 link

Project Description:

Replacement of Bridge File 00110 on Range Road 271 south of Twp Road 534

Scope of Work:

Replacement of the existing bridge with a new bridge structure. Not included in scope of work - upgrading of Range Road 271.

Schedule:

Est. TBD 2025. Approximately 4 - 6 weeks of active construction.

Schedule can change without notice, follow page for monthly updates.

Project Co-ordinator:

Contractor (Primary Contact): TBD

Consultant: (Secondary Contact): TBD

Parkland Project Officer: Jeremy, Hemsing, P.Eng. (780) 968-8888 ext8119, Jeremy.hemsing@parklandcounty.com

Updates:

December 2024 – Engineering design is ongoing. Construction anticipated to be in the fall. (September/October 2025).

Location:

Project Description:

Replacement of Bridge File 00110 on Range Road 271 south of Twp Road 534

Scope of Work:

Replacement of the existing bridge with a new bridge structure. Not included in scope of work - upgrading of Range Road 271.

Schedule:

Est. TBD 2025. Approximately 4 - 6 weeks of active construction.

Schedule can change without notice, follow page for monthly updates.

Project Co-ordinator:

Contractor (Primary Contact): TBD

Consultant: (Secondary Contact): TBD

Parkland Project Officer: Jeremy, Hemsing, P.Eng. (780) 968-8888 ext8119, Jeremy.hemsing@parklandcounty.com

Updates:

December 2024 – Engineering design is ongoing. Construction anticipated to be in the fall. (September/October 2025).

Location:

Page published: 18 Dec 2024, 03:02 PM