Bridge Replacement – RR32, South of TWP Road 530 File 7409

Share Bridge Replacement – RR32, South of TWP Road 530 File 7409 on Facebook Share Bridge Replacement – RR32, South of TWP Road 530 File 7409 on Twitter Share Bridge Replacement – RR32, South of TWP Road 530 File 7409 on Linkedin Email Bridge Replacement – RR32, South of TWP Road 530 File 7409 link

Project Description:

Parkland County is undertaking a design and replacement of BF 7409, located on Range Road 32, south of Twp Road 530.


Scope of Work:

The consultant will:

  • Complete the design of BF 7409
  • Complete the design of the detour route for residents as construction starts

Upgrading Range Road 32 is not part of the scope.


Schedule:

Est. Start date: March 2026 – TBD

Approximately 4-6 weeks of active construction.

Schedule can change without notice, follow page for monthly updates.


Project Co-ordinator:

Consultant: Kirk Morris, 780-267-7723, kirk.morris@mpaeng.ca

Parkland Project Engineer-In-Training: Balbina Nagera, 780-691-4598, balbina.nagera@parklandcounty.com


Updates:

March 2026: Project has been successfully awarded and project has started.

Location:


Project Description:

Parkland County is undertaking a design and replacement of BF 7409, located on Range Road 32, south of Twp Road 530.


Scope of Work:

The consultant will:

  • Complete the design of BF 7409
  • Complete the design of the detour route for residents as construction starts

Upgrading Range Road 32 is not part of the scope.


Schedule:

Est. Start date: March 2026 – TBD

Approximately 4-6 weeks of active construction.

Schedule can change without notice, follow page for monthly updates.


Project Co-ordinator:

Consultant: Kirk Morris, 780-267-7723, kirk.morris@mpaeng.ca

Parkland Project Engineer-In-Training: Balbina Nagera, 780-691-4598, balbina.nagera@parklandcounty.com


Updates:

March 2026: Project has been successfully awarded and project has started.

Location:


Page last updated: 24 Mar 2026, 12:55 PM