Bridge Replacement – RR32, South of TWP Road 530 File 7409
Share Bridge Replacement – RR32, South of TWP Road 530 File 7409 on FacebookShare Bridge Replacement – RR32, South of TWP Road 530 File 7409 on TwitterShare Bridge Replacement – RR32, South of TWP Road 530 File 7409 on LinkedinEmail Bridge Replacement – RR32, South of TWP Road 530 File 7409 link
Project Description:
Parkland County is undertaking a design and replacement of BF 7409, located on Range Road 32, south of Twp Road 530.
Scope of Work:
The consultant will:
Complete the design of BF 7409
Complete the design of the detour route for residents as construction starts
Upgrading Range Road 32 is not part of the scope.
Schedule:
Est. Start date: March 2026 – TBD
Approximately 4-6 weeks of active construction.
Schedule can change without notice, follow page for monthly updates.