Bridge Replacement – Twp 510 East of RR50 File 70230

Share Bridge Replacement – Twp 510 East of RR50 File 70230 on Facebook Share Bridge Replacement – Twp 510 East of RR50 File 70230 on Twitter Share Bridge Replacement – Twp 510 East of RR50 File 70230 on Linkedin Email Bridge Replacement – Twp 510 East of RR50 File 70230 link

Project Description:

Replacement of Bridge File 70230 on Twp Rd 510 East RR 50


Scope of Work:

Removal of existing bridge culvert and installation of 5230mm bridge culvert.

Not included in scope of work – upgrading of Twp Rd 510.


Schedule:

Est. Start Date: June 2025

Est. Completion Date: October 2025

Schedule can change without notice, follow page for monthly updates.


Project Co-ordinator:

Contractor (Primary Contact): Craig Barsi, (780) 786-4014, barsient@telus.net

Consultant: (Secondary Contact): Kirk Morris, P.Eng. (780) 416-3030, ParklandCountyMPA@mpaeng.ca

Parkland Project Manager: Franco Giammarioli, E.I.T. (780) 968-8888 ext. 8390 franco.giammarioli@parklandcounty.com


Updates:

October 3, 2025 – Construction is nearing completion, and the entire culvert has been installed. Contractor is working on installing riprap and completing road construction to final grade.

July 25, 2025 – Barsi will mobilize to site to begin construction. A staged detour with single lane closures and temporary traffic lights will be in place for the duration of the project. Road will remain open during construction.

June 2, 2025 – Pre-construction signage is installed. Construction expected to begin in June 2025 and traffic accommodation information will be posted once it is available.

May 5, 2025 – Construction expected to begin in June 2025.

February 2025 – Construction contract awarded. Anticipated construction start is the summer of 2025.

January 2025 – No Update

December 2024 Design is approved, construction will be started following contract award, anticipated to be summer (June/July 2025). Township 510 will remain open to traffic during construction. Expect delays while traveling along Twp 510.


Location:


Project Description:

Replacement of Bridge File 70230 on Twp Rd 510 East RR 50


Scope of Work:

Removal of existing bridge culvert and installation of 5230mm bridge culvert.

Not included in scope of work – upgrading of Twp Rd 510.


Schedule:

Est. Start Date: June 2025

Est. Completion Date: October 2025

Schedule can change without notice, follow page for monthly updates.


Project Co-ordinator:

Contractor (Primary Contact): Craig Barsi, (780) 786-4014, barsient@telus.net

Consultant: (Secondary Contact): Kirk Morris, P.Eng. (780) 416-3030, ParklandCountyMPA@mpaeng.ca

Parkland Project Manager: Franco Giammarioli, E.I.T. (780) 968-8888 ext. 8390 franco.giammarioli@parklandcounty.com


Updates:

October 3, 2025 – Construction is nearing completion, and the entire culvert has been installed. Contractor is working on installing riprap and completing road construction to final grade.

July 25, 2025 – Barsi will mobilize to site to begin construction. A staged detour with single lane closures and temporary traffic lights will be in place for the duration of the project. Road will remain open during construction.

June 2, 2025 – Pre-construction signage is installed. Construction expected to begin in June 2025 and traffic accommodation information will be posted once it is available.

May 5, 2025 – Construction expected to begin in June 2025.

February 2025 – Construction contract awarded. Anticipated construction start is the summer of 2025.

January 2025 – No Update

December 2024 Design is approved, construction will be started following contract award, anticipated to be summer (June/July 2025). Township 510 will remain open to traffic during construction. Expect delays while traveling along Twp 510.